Photo of Broadway Plaza
Photo by July Monday

Broadway Plaza

3.2(5)

Electrify America

4 ports · J1772 / CCS1 · up to 350 kW

PRICING

$0.64 / kWh

AI Overview

Chargers are located on the 3rd floor (P3) roof level of the parking garage, near Nordstrom and the elevators. The lot can be confusing to navigate—drivers note two garages with minimal signage. A State of Charge limit of 85% is enforced here; charging beyond that point may incur additional fees. Parking is free. Drivers have reported occasional charger outages, so availability may vary.

Address

1275 Broadway PlazaWalnut Creek, CA 94596United States

Hours

Open 24 hours

Reviews

  • Viki Hollander★★★★★Nov 2025 • Google Maps

    The charging bays are on the Nordstroms end of the mall, 3rd floor roof. It's near the elevators. Unfortunatly, got stuck because of holiday shopping and having to validate parking, to get out.

  • Alan B★★★★★Oct 2025 • Google Maps

    I don’t know who designed or mapped the Electrify America station at 1275 Broadway Plaza, but it’s a masterclass in how not to build an EV charging site. The app says it’s “in the South Broadway Garage near Nordstrom.” Reality? You’ll circle the entire mall like a fool. There are two garages, both with zero signage, one is flat and dead empty, and the other—the one with the supposed chargers—is blocked off with barricades and zero public access. No entry, no ramps, no clear directions, nothing. Even the mall’s own maps and Electrify America’s GPS send you to dead ends. I wasted half an hour burning battery hunting for a “top level” that doesn’t exist. For a company that’s supposed to make charging convenient, this is embarrassingly bad. Electrify America, fix your maps, add signs, or remove this location until it’s actually usable. Total fail.

  • Mona Paradise Parking★★★★★May 2025 • Google Maps

    There are constantly chargers out of service, currently only one of three is working. Also, there is a 85% charge limit but there is only a small sign that notifies the customer of this which most people wouldn’t notice resulting in extra charges while you wait for your car to charge fully whilst you are getting penalized.

  • July Monday★★★★★Apr 2022 • Google Maps

    Partially-shaded on roof of structure. Usual cheap EA pricing, especially for members. Free parking for 3 hours w plenty nearby.

  • Jennifer Parker★★★★★Feb 2022 • Google Maps

    Great location. Near the elevator in the third level. Wish it was a 350kw, but this will do.

More EV charging in Walnut Creek, CA