
Greenlife Energy Solutions
3.4(5)
ChargePoint
1 ports · CHAdeMO / CCS1 · up to 62 kW
PRICING
Free + $18.00 / hr
AI Overview
The charger is located in a parking lot behind the building (not visible from the street). It is a single charger with both CCS and CHAdeMO connectors. The location is remote with limited nearby amenities. Drivers report a $75 card hold is required before charging.
Address
6760 Washington AvenueEgg Harbor Township, NJ 08234United StatesHours
Open 24 hours
Reviews
Selena Wong★★★★★Dec 2025 • Google Maps
Pretty secluded, I love them, charge good, but before they put a $1 hold on card then after the charge they’ll charge my card. Now they require a $75 hold. Like what!? Your gonna lose customers like that, ridiculous
Joseph Goss★★★★★Oct 2025 • Google Maps
Location in the back of Greenleaf building. One charger with CCS and CHAdeMO adapter. Best kW was ~52.
Kimiyasu Mizoo★★★★★Dec 2024 • Google Maps
Located in the behind of a building. Very industrial. 1 charger (2 types cords). Nothing nearby other than the brewery and it was closed when I was there. Took 40 minutes from 60% to 80% on Chevy Equinox EV. Not very fast. I would avoid this charger if there are other choices.
Monnish Choudhary★★★★★Jan 2024 • Google Maps
First time using ChargePoint. It was in a very remote and desolate parking lot. Also the screen on the charger was not very good to use. You must download the app and it was ok to use. Overall was able to charge the Volvo C40 electric suv from 20% to 90% in 50 minutes. There’s only one charger so definitely check the app to see if it’s in use or not.
Gillis Da Kid★★★★★May 2022 • Google Maps
Located in the back of the Hidden Sands Brewing Company. Pretty nice spot only 2 chargers though. Never had a problem charging here. The chargers take about 30 minutes to 80% depending on how low you are. If they put more chargers here it would be great, bc one time 3 cars showed up to charge at the same time and they had to wait.




