Photo of Mass Electric Construction Sterling Ma
Photo by James Dion

Mass Electric Construction Sterling Ma

3.4(5)

ChargePoint

4 ports · J1772 · up to 12 kW

PRICING

Free

Info

Near Main Entrance

Address

11a Dana Hill RoadSterling, MA 01564United States

Hours

Open 24 hours

Reviews

  • Spee Watson★★★★★Apr 2026 • Google Maps

    Only two level-3 CSS chargers exist there, abutting a tranquil wooded trail. Fortunately both were available, and I got a quick 20 minute addition of many miles on my Honda Prologue, and was on my way. My only complaint.... The charging cords do not have the usual Chargepoint retractable extending wire to allow connection without being right up close to the unit. Consequently, you need to back in, or pull up real tight, being careful not to hit the unit itself.

  • Gabriela★★★★★Nov 2025 • Google Maps

    A Level 2 charger gave me about 120 miles in around 35 minutes — really reliable. I used Charger 1. It’s the ChargePoint+ system: you just download the app, add your card, and you’re good to go. 👍

  • Ezekiel Elin★★★★★Nov 2025 • Google Maps

    This is a 70 kW charger that splits down to 25 kW for the second vehicle when both are in use

  • James Dion★★★★★Sep 2025 • Google Maps

    ATTENTION DON’T skip without reading Veryyyyy misleading!!!! Shows online as 205KW fast charger only doing 33KW very sad had to drive all the way here with 4% while could gone somewhere else not have to wait 2 hours no one got time to waste for your slow charger

  • Anthony★★★★★Sep 2025 • Google Maps

    Unreliable. These have been out of commission twice in the last two weeks.

More EV charging in Sterling, MA