
Quality Oil Company, Llc-1980 Pecan Lane
3.0(5)
EV Connect
4 ports · CHAdeMO / CCS1 · up to 150 kW
PRICING
$0.62 / kWh
AI Overview
Only the right charger is consistently operational; the left has been broken for an extended period. Cables are notably short. Multiple drivers report significantly slower charging than advertised speeds. The station occasionally offers free charging, but payment methods and terms vary — confirm before relying on it.
Address
1980 Pecan LaneKernersville, NC 27284United StatesHours
Open 24 hours
Reviews
Erin Johnston-Turlington★★★★★Apr 2026 • Google Maps
Only one dispenser working and it sounds like it might lift off into space. Max I pulled was 111kW, my car will take double that so performance is an issue.
Brad T★★★★★Mar 2026 • Google Maps
Is it just me, or does Duke Energy’s charging network feel like a gamble? I keep seeing $25 holds on my account regardless of charge time, and the reliability is abysmal. Every stop seems to have at least one unit out of service, broken screens, or cables so short they barely reach the port. Electrify America is the better, reliable option. Plus you will have more than TWO chargers to choose from.
Michael Clayton★★★★★Jan 2026 • Google Maps
Cords are very short. In Jan 2026 the left tower works but the right tower is broken. Both screens are broken, but I was able to charge from the left tower by using the app. It changed at 25 kW, much less that the stated 150 kW.
Tracy S★★★★★Apr 2025 • Google Maps
Great charging speed and setup but this location needs at least 4 more working pumps added. There are only 2 available and one is constantly down. Nearly every time we come there are people waiting in their cars for others to finish up and leave.
Michael★★★★★May 2024 • Google Maps
The only Fast Charger in close proximity to Winston Salem for us that have EVs that don’t say Tesla on the side.




